Hybrid solarization

7 KVA to 35 KVA hybrid solar plants keeping security installations and commercial facilities powered through grid interruption — with the diesel bill falling as a side effect.

0Engagements delivered
0Client organisations
35 KVALargest plant delivered
Scope of work

What this category covers

Security installations cannot wait for load-shedding to end. These plants combine PV generation, battery storage and grid or generator fallback so critical operations simply do not stop.

Load Audit & Sizing

Measured load profiling and payback modelling before a single panel is quoted — so the plant matches the actual demand curve, not an optimistic estimate.

Hybrid Inverter Systems

Hybrid inverters managing PV, battery and grid or generator input, with automatic changeover that critical equipment never notices.

Battery Storage

Lithium or tubular storage banks sized for the outage duration your site actually experiences.

Structure & Installation

Mounting structure, DC and AC wiring, protection, earthing and commissioning to PEC standards.

Net Metering Support

Documentation and coordination for net-metering approval where the site and tariff allow it.

Maintenance Contracts

Annual maintenance with performance reporting — because an unmonitored solar plant quietly underperforms for years.

The engagements

Every contract in this category

Transcribed from signed work orders, highest value first. A dash means the figure was not stated on the work order.

#ProjectDepartment / Client Completion Status

Completion certificates and client references available to prospective clients on request.

Case detail

The engagements that defined this category

Toyota 35 KVA Solar Plant

Toyota Zarghoon Motors · May 2025

Our largest solar installation — a 35 KVA hybrid plant for a commercial automotive facility, delivered alongside the dealer management platform for the same client.

CTD 12 KVA Hybrid Plant

CTD · June 2025

A 12 KVA hybrid solarization securing uninterrupted power at a Counter Terrorism Department installation, cutting generator fuel dependency.

Balochistan Constabulary 12 KVA

Balochistan Constabulary · Mar 2025

Our first hybrid solar engagement — a 12 KVA plant for the Balochistan Constabulary that opened the energy practice and led directly to the CTD contracts.

CTD 07 KVA Hybrid Plant

CTD · October 2025

A 7 KVA hybrid system for a smaller departmental facility, sized against a measured load profile rather than a standard package.

How we delivered

Sized against measured load, not guesswork

Most underperforming solar installations were mis-sized on day one. We measure before we quote, and we tell you when a smaller plant would serve you better.

  • Load audit with measured consumption over a representative period
  • Payback modelling against your actual tariff and diesel spend
  • System sizing for the outage duration the site really experiences
  • PEC-standard installation, protection and earthing
  • Commissioning with performance verification against design output
  • Annual maintenance with periodic performance reporting
Discuss a similar requirement
4
Hybrid solarization engagements
Clients

Organisations served in this category

Counter Terrorism Department
Counter Terrorism DepartmentGovernment of Balochistan
Balochistan Constabulary
Balochistan ConstabularyProvincial Force
Toyota Zarghoon Motors
Toyota Zarghoon MotorsAutomotive
Questions

Common questions

How do you size a system?
By measuring, not estimating. We profile your actual load over a representative period, establish which circuits are genuinely critical, and size PV and storage against that. Departments are often surprised how much of their connected load does not need to be on backup.
What is a realistic payback period?
It depends on your tariff, your current diesel spend and your outage frequency. We model it explicitly before you commit, and we show the assumptions so you can challenge them. For sites running generators heavily, payback is usually the strongest part of the case.
Lithium or tubular batteries?
Lithium costs more upfront, lasts longer, tolerates deeper discharge and needs less maintenance. Tubular is cheaper and more forgiving of poor ventilation. We recommend based on your site conditions and maintenance capacity, not on margin.
Who maintains it afterwards?
We do, under an annual maintenance contract with performance reporting — or we train your facilities staff to handle routine checks and keep us for the annual service. Either way, an unmonitored plant degrades silently, so somebody should be watching the numbers.
Related

Explore next

Paying too much for diesel?

Start with a load audit. It is a fixed-price engagement and it tells you honestly whether solar makes financial sense at your site.